Public Transit

What CAFES is asking candidates to commit to

Ottawa is losing the transit race against the car. CAFES is asking candidates to commit to: 

  • improve transit service while keeping fares affordable for all;
  • support uploading the LRT/O-Train to the Province to unlock $85M per year to commit to transit service; 
  • secure a binding provincial commitment for the  LRT Stage 3 expansion to Barrhaven, Kanata and Stittsville;
  • measure OC Transpo cost-and-time-competitiveness with driving throughout the City 
  • expand rural and demand-responsive transit to underserved communities; and 
  • give buses the road — starting with 24/7 dedicated bus lanes on Bank Street, Carling, and Baseline.

Why This Matters for Ottawa

CAFES’s 2022–2026 policy priorities put it plainly: “Public transit needs to become cost-and-time-competitive with the private car so that car owners choose to take transit regularly.” Yet since 2020, fares have climbed, routes have been cut, and LRT reliability has struggled.  Every one of those choices pushes riders into cars — driving up emissions, road costs, household transportation bills, insurance and congestion, and hitting seniors, low-income residents and rural communities hardest.  

A rare opportunity has now emerged: on April 22, 2026, Ottawa’s Mayor and Ontario’s Transportation Minister signed a Memorandum of Understanding to conduct an evaluation toward uploading ownership of the LRT/O-Train and Highway 174 from the City to the Province. If completed, this would free approximately $85 million per year currently spent on LRT capital, maintenance and operating costs — money that could instead flow directly into expanded bus service, Zero-Emission Bus procurements, and rural transit development. The MOU also creates the conditions for securing a provincial commitment to LRT Stage 3, which would bring rail to Kanata, Stittsville, and Barrhaven, and for the first time giving Ottawa’s fastest-growing southwestern communities a realistic transit alternative to the car.  This development is a great opportunity provided the City maintains control over LRT/O-Train frequency.

Ottawa has no dedicated transit funding tool. Ottawa’s OC Transpo balances on fares and property tax, so every ridership dip forces fare hikes or service cuts that lose more riders. Federal dollars — the permanent Canada Public Transit Fund from 2026–27 and the Canada Infrastructure Bank’s Zero Emission Bus initiative — are capital-only. The operating side is Ottawa’s problem to solve. The LRT upload, if completed, offers the first structural remedy: shifting the annual $85M LRT cost burden to the Province would give the next Council real operating headroom without a tax increase. The next Council will negotiate the final upload deal and must secure the LRT Stage 3 commitments as part of it.

Where Ottawa Stands Today

Council has responded to a post-pandemic ridership shortfall with above-inflation fare hikes and service cuts.  Dedicated bus lanes are still contested corridor-by-corridor. The LRT upload MOU is a promising structural shift — but the details of a final deal, a Stage 3 LRT commitment, and how the freed funding gets deployed are all yet to be decided, and will fall to the incoming Council.  At the June 11, 2026 Transit Committee meeting, OC Transpo reported that ridership in April was at 67% of the pre-pandemic levels. 

  • April 22, 2026: Ottawa’s Mayor and Ontario’s Minister of Transportation signed an MOU to conduct an evaluation toward uploading the LRT/O-Train and Highway 174 to the Province. A final deal is estimated 12–18 months away. Metrolinx would take over ownership, costs and operation of the LRT, with Council-approved principles requiring OC Transpo to retain local service delivery control and that Metrolinx maintain a significant Ottawa presence.
  • June 2026: The City’s Auditor General tabled an independent audit of Bus Service Planning and Scheduling on June 19, 2026, finding that OC Transpo’s current schedule cannot be consistently delivered with existing resources, that service standards date from 2005 and are no longer publicly accessible, and that New Ways to Bus was driven primarily by a $10 million cost-cutting target rather than service principles.
  • June 2026: Technical issues with Line 1 of the LRT/O-Train resulted in reduced service capacity and impacts to the start of integration testing on the Line 1 East extension.  
  • April 2026:  OC Transpo highlighted monthly issues impacting bus and LRT/O-Train service.  For the bus fleet, the following issues came up:
    • Unrealistic and inflexible scheduling of routes and drivers exacerbate delays which routinely result in undelivered routes.  The June 2026 Auditor General’s report found that 29% of longer weekday routes had run times out of step with reality by 10% or more because the schedules were built on 2023 traffic data and never systematically updated. 
    • Bus maintenance coupled with a shortage of maintenance staff caused 29% of undelivered trips.  Ripple effects of the LRT/O-Train technical issues have impacted bus availability and scheduling.
      • The average age of the 330 60’ buses exceeds the 15-year lifespan. By Q1-2027, 50 new 60’ diesel buses will arrive to displace the oldest and most costly buses in the fleet.  Refurbishments to extend the lifespan of 30 buses for standby capacity are now planned.  By the end of 2027,the 60’ high capacity fleet will be 80 buses (11% of fleet as described at the Transit Committee meeting of June 11, 2026).
      • The Auditor General found that 81 buses (15% of OC Transpo’s peak fleet) are committed to school routes, and that school routes received the highest cancellation protection, meaning general commuter service is deprioritized when buses run short. The Province of Ontario funds student transit passes through the school boards but does not contribute to the operating costs of the peak service those passes depend on. 
      • Zero Emission fleet integration was delayed but is now ramping up (131 ZEBs in June 2026, 228 ZEBs by end of 2026) through to the end of 2027.
    • Para-Transpo riders continue to face inequitable service.  Same day, real-time trip scheduling, hours of service and mechanical issues continue to plague users.
  • For the 12 months ending in March 2026, total ridership for Para Transpo was about 904,000 trips, up 4.9% over the previous year.  Ottawa’s Para Transpo riders, many of whom have disabilities or elevated health vulnerabilities, depend on the service and have very few alternatives for transportation. Para Transpo riders are exposed to elevated levels of dangerous emissions due to longer idle times when passengers embark and disembark. 
  • March 30, 2026: At the Public Works and Infrastructure Committee, CAFES pushed for 24/7 dedicated bus lanes on Bank Street plus smart curb management as part of the Bank Street Active Transportation and Transit Priority feasibility study.  A pilot program for time of day dedicated bus lanes and the removal of 17 on-street parking spots(< 1% of total available spots which includes 139 underutilized spots at the Glebe Parkade) was proposed by staff. The $250k 1- year pilot program would evaluate impacts to transit travel times, business impacts, automobile through traffic impacts, parking utilization, safety, local side street impacts, compliance and communication.  
  • Rural households have transit requirements that are currently not being met. Beyond commute distances, rural residents are demographically older.  Seniors face transportation obstacles that make aging in place a challenge.  Commutes to and from local appointments, and night-time outings are out of reach if not served by Para Transpo or community-based non-profit transportation organizations.  Many older residents prefer not to drive at night due to the dark roads and bright lights of on-coming vehicles.  Some residents (younger and older) may not have a car or driver’s license.  Shift work, rural business development,  and educational opportunities are not accommodated by transit.  A motion by Rideau-Jock Councillor David Brown to study private transit providers for rural areas passed at the Agriculture and Rural Affairs Committee in April 2026 but failed on a 12–12 tie at full Council, with one section on rural transit funding fairness passing. Rapidly growing rural villages like Richmond, Vars, and Manotick receive only peak-hour or peak-direction service — and many smaller rural villages receive no commuter or local service.

Concrete Commitments CAFES is Asking Candidates to Make

1. Support the LRT upload to the Province — and demand Stage 3 as part of the deal.

  • The April 2026 MOU is an important step, but a final upload agreement is 12–18 months away and will be negotiated by the next Council. CAFES asks candidates to:
  • Support completing the upload on the principles Council approved: fair to Ottawa taxpayers, appropriate Metrolinx accountability, OC Transpo retaining local service and hiring control, and Metrolinx maintaining a meaningful Ottawa presence.
  • Insist that a binding provincial commitment to fund and build LRT Stage 3 — to both Barrhaven and Kanata/Stittsville — is a condition of finalizing the upload agreement, not an afterthought. Premier Ford made this commitment during the 2025 election; the upload deal is the moment to enforce it.
  • Redirect the $85M per year freed by the upload into a locked transit reinvestment fund — dedicated to zero-emission bus procurement, rural transit expansion, and bus service restoration. Not into general revenue or tax relief.
  • Advocate that Bill 98, The Fare Alignment and Seamless Transit Act, 2026, maintain, and enhance as required, the regional STO transfer policies, the trip booking software, and the transit service levels.
  • Candidates should commit to renegotiating the school transportation arrangement with the Province as part of the LRT upload to ensure OC Transpo’s operating costs are properly recovered.
  • Ensure the transfer agreement makes provision to electrify O-Train lines 2 and 4.

2. Make OC Transpo bus operations more reliable and proactive

  • New key performance indicators like mean distance between failure, in service bus failures, and proactive vs reactive bus maintenance ratios will be measured going forward.  Current reporting based on system-wide averages conceals route-level failures. Add route-level performance reporting KPIs as recommended by the Auditor General (AG). Use the data to identify actions that increase reliable service at required service levels in particular during peak service times.   Data from GPS is available but the ability to synthesize and report on the data is lacking in house. To make timely and effective changes is a complex task for which AI is well suited.  Pilot the use of AI to arrive at effective reporting and operational objectives. Ensure contingency levels for drivers, buses, and maintenance staff are available and report on the usage of spare bandwidth.  The Auditor General highlighted that KPIs specific to ZEBs should be measured and reported.

3. Give buses the road — build dedicated 24/7 bus lanes on at least three priority corridors, starting with Bank Street

  • Manage curbs to ensure expedient movement and reasonable access along corridors.  Deploy digital curb tools such as mapping parking/stopping restrictions, asset and hydrant locations, curb measurements, wayfinding and dynamic signage.  Determine policies using smart curb management tools to ensure buses move faster than cars. Pilot dedicated bus lanes on the three main corridors within Ottawa (Bank Street, Carling Ave, and Baseline Ave).  Ensure dedicated bus lane capacity is measured and optimized.  Ensure transit, emergency services and public works develop joint plans to ensure more frequent buses if warranted and shared access with emergency vehicles.  Demonstrate that dedicated bus lanes also serve through traffic and make transportation along corridors more efficient for all.

4. Make OC Transpo fares more affordable in 2027 

  • Above-inflation fare hikes in a system losing riders is a losing strategy. Fares are a cost-of-living issue as well as being a climate and an equity tool. They, along with improving service, are the fastest ways to win riders back.  Note that the AG independently confirmed that New Ways to Bus (April 27, 2025) was primarily a cost-reduction exercise presented as a service redesign which damaged rider trust.   Analyze Para-Transpo fare structures for both urban and rural passengers paying close attention to addressing accessibility barriers, complexity, and affordability.    

5. Implement minimum service standards and publish performance reports yearly

  • Write minimum service standards into policy (at least 15-minute all-day frequency on the Frequent Transit Network) with explicit requirements for seniors, rural residents, and para-transit users. OC Transpo’s primary documents outlining its transit planning standards — the Transit Service and Fare Policy Manual and the Transit System Management Policies — were published in 2005 and are no longer publicly accessible. The AG notes that since 2005, new O-Train lines have opened, the population has grown significantly, and ridership patterns have shifted fundamentally — yet no consolidated update has occurred.  The 2005 service standards require 95% of residents to live within 800 metres of all-day service. The incoming Council should require the standards to be updated and consolidated within two years, with a mandatory review cycle every 5 to 10 years before any major network redesign.   

6. Begin visioning for the next possible expansion plans 

  • The City needs to consider what will come after the Stage 3 LRT/O-Train and current plans for BRT.  By the end of 2027, the OC Transpo bus fleet will have an average age of 4 years.  However, the 260 (37% of fleet) 40’ diesel buses will have an average age of 8 years.  The 60’ articulated fleet will comprise only 12% of the bus fleet.  OC Transpo and the next council must plan for the gradual procurement of new (ZEB) buses to address capacity and reliability before another reliability cliff is hit.   The current transition to ZEB buses being 1:1 replacement of diesel buses has structural flaws according to the AG report.  Other transit agencies also transitioning from diesel to ZEB fleets have adopted higher replacement ratios, ranging from a 5% to 15% contingency fleet, to address range limitations as well as garage maintenance and storage impacts associated with zero-emission fleets. The AG also found that only 57% of blocks on weekdays are currently compatible with ZEBs — meaning the remaining 43% will require either additional buses or schedule redesign for the foreseeable future. 

7. Pilot what actually competes with the cars and increases ridership

  • Test low-fare days, free-transit Sundays, HOV lanes, and higher downtown parking fees.Study and determine dynamic parking fee programs along priority corridors.  Report annually on reliability, convenience, affordability and safety of transit on a per block/route basis.   Increase social media communication so residents are well informed about issues.   Address issues of safety, cleanliness, and accessibility at bus and O-Train platforms.

8. Develop a Rural Transit Strategy and fund demand-responsive service for underserved communities.

  • Ottawa’s rural communities have some of the highest per-capita car-dependence and among the longest vehicle trip distances — making them both a major emissions source and an underserved transit market. CAFES asks candidates to:
  • Develop a Rural Transit Strategy in partnership with rural and suburban councillors, community organizations, and residents — identifying top destinations (Park and Ride lots, medical appointments, grocery, employment and educational centres) and minimum service standards for communities including Barrhaven, Manotick, Richmond, and eventually Tewin.
  • Fund a demand-responsive transit (DRT) pilot in at least two rurally-focused zones during this Council term, prioritizing zero-emission vehicles for all new procurements in this program. Demand-responsive models match vehicles to actual trip demand, making service viable at densities where fixed routes fail.
  • Ensure Tewin’s transit is operating before first residents arrive and ensure that it connects to, or uses rapid transit nodes.

9. Support plans for the Gatineau Tramway. 

  • Although plans are currently in flux, the Gatineau Tramway could see trams from Gatineau crossing over onto Ottawa streets. Ottawa should support the enhanced mobility such a project could afford its residents.

Likely Objections — And How to Respond

Objection

Response

An LRT upload would give away Ottawa’s transit infrastructure.

Ottawa taxpayers currently shoulder 55% of LRT capital costs — a share unmatched anywhere else in Ontario, where comparable projects see local governments pay as little as 5%. The upload corrects that unfairness and frees $85M per year to commit to improved bus services. Council’s approved principles preserve OC Transpo’s local control over service and hiring. This is a structural funding fix, not a surrender.

Stage 3 LRT to Barrhaven or Stittsville is too expensive.

The Environmental Assessment is done and the corridor is planned. The PC Party committed to Stage 3 during the 2025 provincial election. The upload deal would be the right moment to lock that in — transferring construction costs to the Province as part of the same package that takes the LRT liability off Ottawa’s books.

Diesel buses are more reliable in Ottawa winters

Other cold-climate cities run large electric fleets using the appropriate charging infrastructure. Diesel fuel prices continue to be subject to global geopolitics.   Quality of life factors include: Fine particulate emissions from diesel buses are carcinogenic, and electric buses are quieter.

The City can’t afford more transit spending.

Ottawa’s population is predicted to increase by ~ 500,000 by 2051.  Without improved public transit to move people to work, school, and within their communities, road expansion will be unsustainable.

Para Transpo electrification is too complex — accessible ZEBs aren’t ready.

Electric accessible mini-buses are commercially available today. It’s not more complex, we just have to plan.

Rural transit is too expensive to run.

There is a need for rural transit and we need to respond. Demand-responsive transit is catching on as effective and efficient elsewhere in rural areas in Canada.

For Further Information

CAFES Ottawa (cafesottawa.ca)  •  CAFES Recommended Term of Council Policy Priorities 2022–2026, Mobility chapter  •  CAFES Advocacy Tracker 2024–2026 (Transit Committee Delegations #20 and #21; PWTC March 30, 2026)  •  City of Ottawa Transportation Master Plan and Climate Change Master Plan  •  OC Transpo Zero-Emission Bus Program  •  City of Ottawa Green Fleet Strategy (WSP, Jan 2025)  •  Glen Gower, “Why uploading the LRT matters for Ottawa transit and taxpayers” (April 29, 2026)  •  Ecology Ottawa public-transit campaign.

WHERE DO YOU STAND?

We look forward to seeing your platform. Thank you for standing as a candidate in our municipal election.
cafesottawa.ca • info@cafesottawa.ca

References — Energy Transition and Electrification

Sources consulted and cited in this brief. Candidates and drafters should verify current figures against City of Ottawa staff reports and Council-approved plans.

CAFES Ottawa. Recommended Term of Council Policy Priorities 2022–2026. Mobility chapter: “Public Transit that Works.” Ottawa, 2023. cafesottawa.ca

City of Ottawa. Climate Change Master Plan (approved 2020). 80% community GHG reduction by 2040; 100% by 2050. ottawa.ca

City of Ottawa. Transportation Master Plan. ottawa.ca

City of Ottawa. Energy Evolution — Ottawa’s Community Energy Transition Strategy (adopted 2020). Identifies rural transportation and transit electrification as key pathways. ottawa.ca/energyevolution

City of Ottawa / OC Transpo. Zero-Emission Bus Program — Transition Plan. octranspo.com

City of Ottawa. Green Fleet Strategy (WSP Project 231-01434-00, Revised Jan 2025). Para Transpo and non-transit fleet decarbonization pathways.

OC Transpo. Transit Committee Update, February 12, 2026; April 9, 2026, May 14, 2026, June 11, 2026. ZEB commissioning projections; LRT East extension delays and bearing replacement issues.

Glen Gower. “Why uploading the LRT matters for Ottawa transit and taxpayers.” Straight Outta Stittsville (Substack), April 29, 2026. Covers the April 22, 2026 MOU signed by Mayor Sutcliffe and Minister Sarkaria; $85M annual saving; Stage 3 commitment; Metrolinx governance principles approved by Council.

City of Ottawa. Council Motion — Principles for LRT Upload Deal (Item 21.1 – October 08, 2025  ). Approved principles: fairness to taxpayers, Metrolinx accountability and Ottawa presence, OC Transpo retaining local service delivery and hiring control.

City of Ottawa. Barrhaven LRT (Baseline Station to Barrhaven Town Centre) Planning and Environmental Assessment Study. 10 km twin-track, 7 stations, $3B estimated cost. ottawa.ca

City of Ottawa. 2025 and 2026 Draft Budgets — Transit Services. Fare increases and service adjustments. ottawa.ca/budget

OC Transpo. EquiFare low-income transit pass. octranspo.com/en/fares

City of Ottawa. Tewin Development — Principles of a Memorandum of Understanding (Annex 12, Official Plan). Developer transit obligations: OC Transpo operating costs, staff, fuel, buses, and charging station installation. “Tewin pays for Tewin” principle.

CBC News. “Councillor, transit union to face off over private bus service in rural Ottawa” (April 2, 2026); “Private bus motion fails on tie vote at council” (April 8, 2026). Covers Coun. Brown’s motion on rural transit, ARAC passage, full Council 12–12 defeat, partial passage of rural transit funding review.

Government of Canada. Canada Public Transit Fund (permanent capital funding flows beginning 2026–27). infrastructure.gc.ca

Canada Infrastructure Bank. Zero Emission Bus initiative and Zero Emission Transit Fund. cib-bic.ca

Hemson Consulting. Growth Forecasts to 2051 — Population and Housing Projections for Ottawa to 2051. Tabled at Joint Housing and Planning and ARAC Committee, February 18, 2026. Ottawa’s population is projected at 1.3 million by 2030.

TransLink (Metro Vancouver). Regional fuel tax and parking sales tax — dedicated municipal-regional transit revenue tools. translink.ca

Société de transport de Montréal (STM). Dedicated regional transit funding. stm.info

Statistics Canada. Low-Income Cut-Off (LICO) and Ottawa journey-to-work data. statcan.gc.ca

Ecology Ottawa. Public transit and climate campaign materials. ecologyottawa.ca

City of Ottawa, Office of the Auditor General. Audit of Bus Service Planning and Scheduling (File No. ACS2026-OAG-BVG-007). Tabled at Audit Committee, June 19, 2026. Available at oagottawa.ca. 

CBC News, Arthur White-Crummey, June 18–19, 2026